India, ADB ink USD 375 mn loans pact for Vizag-Chennai industrial corridor
By TIOL News Service
|
NEW DELHI, FEB 28, 2017: THE Asian Development Bank (ADB) and the Government of India signed here 5 million in loans and grants to develop 800-kilometer Visakhapatnam-Chennai Industrial Corridor, which is the First Phase of a planned 2,500–kilometer long East Coast Economic Corridor (ECEC). The Corridor is expected to spur development on India’s eastern coast in line with the Government of India’s Make in India policy to stimulate manufacturing, and Act East policy to integrate the Indian economy with Asia’s dynamic global production networks.
The signing event was held on 23.02.2017 followed the ADB approval of 1 million in loans and grants in September 2016 to develop the Visakhapatnam-Chennai Industrial Corridor. ADB’s approved loans comprise a 0 million multi-tranche facility to build key infrastructure in the four main centers along the corridor – Visakhapatnam, Kakinada, Amaravati, and Yerpedu-Srikalahasti in the State of Andhra Pradesh. The First Tranche of 5 million was signed today that will finance sub-projects to develop high-quality internal infrastructure in 2 of the 4 nodes of the corridor–Visakhapatnam and Yerpedu-Srikalahasti.
Another component of the approved ADB funds signed on 23.02.2017 was a 5 million policy-based loan that will be used for capacity development of institutions engaged in corridor management, provide support to enhance ease of doing business and for supporting industrial and sector policies to stimulate industrial development.
Among the outputs envisaged under the 5 million tranche 1 loan include strengthening and widening of a 29.6-kilometer section of state highway to four lanes to improve connectivity from Kakinada Port to National Highway 16, investments in smart water management in Visakhapatnam to reduce nonrevenue water and provide continuous water supply, upgrading 7 power substations to supply high-quality and reliable power supply to Visakhapatnam, Naidupeta, and Yerpedu-Srikalahasti industrial clusters, and effluent treatment facility in Atchutapuram and Naidupeta clusters.
The tranche 1 loan will have a 25-year term, including a grace period of 5 years, a 20-year straight line repayment method at an annual interest rate determined in accordance with ADB’s LIBOR-based lending facility.
|